energyNP.com  
Tel
98510-91900¡¡
Email
energyNP@hotmail.com¡¡
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy
 
 

CCPG to complete Dhalkebar substation by Oct

The Central China Power Grid (CCPG) ¡ª contractor of the Dhalkebar substation project ¡ª has pledged to complete the construction work of the project within October.

Electricity transmission line. Photo: Ministry of Energy
 

This commitment by CCPG was made during a visit by Minister for Energy Mahendra Bahadur Shahi and Managing Director of Nepal Electricity Authority (NEA) Kulman Ghising at the project site in Dhalkebar, Dhanusa, on Saturday. The government team had visited the site following reports regarding the delay in construction work.

On the occasion, Project Manager of CCPG Geng Jialing, said that the project can be completed within the next two months if the contractor is provided necessary resources promptly and the government assures a working environment in the project site.

The monitoring team had concluded that though almost 80 per cent of the construction work at Dhalkebar substation was completed, the remaining work was delayed due to lack of coordination between the contractor and the consultant company of the project regarding bill payments and cable trench.

Thus, the minister-led team has directed consultant company to issue final drawing of cable trench road within Sunday and also directed CCPG to submit progress payment bills to the consultant for verification so that the consultant can recommend NEA to finalise the payments.

Minister Shahi also urged the contractor to report of any work related problem at the substation directly to the Ministry of Energy or the NEA.

Similarly, NEA MD Ghising said that CCPG should complete the Dhalkebar substation project by the stimulated time period (October) as project carries national significance.

As NEA had terminated the contract of CCPG, which was also working in the Bharatpur-Bardaghat transmission line on June 5, the contractor had begun showing dissatisfaction with NEA by delaying work at the Dhalkebar substation project, which was supposed to be completed by early 2017.

The completion of Dhalkebar substation is expected to improve the transmission network of the country. The country will be able to import an additional 100 megawatts of electricity on top of the existing 145 megawatts from India after the Dhalkebar substation is charged at 220 kV, which is critical to end load shedding.

With the power demand increasing in the country with almost 1,500 megawatts of demand in peak hours in winter, increasing import from India is vital for NEA for load management during the winter season.

The CCPG and NEA had signed the Dhalkebar substation project contract on June 12, 2014 with a target to complete it within 15 months.

[August 06, 2017 / thehimalayantimes.com]¡¡¡¡¡¡
 
¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Electric Folded Treadmill Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries