energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
 

Kaligandaki transmission line construction work hampered

Project awaiting green signal to cut trees along alignment of the 220 kVA transmission line

Works on the construction of power transmission line of the Kaligandaki hydropower project have been affected as the national pride project awaits orders to cut down trees for the purpose.

The project is waiting for a green signal to cut trees along the alignment of the 220 kVA transmission line from Dana of Myagdi to Khurkot of Parbat. As a result, the construction of 30 pylons on the Dana-Khurkot transmission line has been stalled.

Although the Council of Ministers had made a decision on December 28, 2017 to allow cutting down 4,208 trees along the Kaligandaki Transmission Line Corridor, the decision has not been implemented. The government had also decided to provide 2.58 hectares of land to the project for the construction of the 30 power pylons.

Project chief Chandan Kumar Ghosh said the work of constructing the power pylons and connecting cables has been stalled as the decision of the Council of Ministers has remained unimplemented for a year. The project has not been able to enter the forest area as it is not authorised to cut down trees for moving ahead with the construction works.

Regarding the issue, the Division Forestry Office Myagdi said that the order to cut down trees has been halted as the project has not paid any heed to implementing the agreement it reached with the Department of Forests whereby the project would have to provide an equal measure of land that it would occupy in the forest area.

As per the agreement, there is also an alternative of making cash payment equivalent to the cost of the land that is needed to be acquired including the cost required for planting and taking care of the tree saplings if the project cannot provide the land.

However, Ghosh said that they have not found appropriate land to be made available to the District Forestry Office and were ready to pay cash if the office gave them the figure of land valuation.

Nepal Electricity Authority is constructing a sub-station each at Dana and Khurkot, and the 39-kilometre transmission line to feed the electricity to be generated from the project. The project is under construction in the northern belt of Myagdi and in Mustang. Eleven community forests are affected by the project in Myagdi.

It is stated that 477 large trees and 981 small trees need to be cut down for the transmission line in Myagdi.

So far 81 out of the total 114 towers of the project have been constructed. Sub-stations are also under construction at Dana of Annapurna rural municipality-3 and at Khurkot of Kushma municipality-1 in Parbat. Power cables have already been installed at places where the towers have been constructed.

The contract agreement had been reached between Tata Projects and Chint Electric JV in 2016 for the construction of the sub-station and the transmission line from Dana to Khurkot. The project cost is Rs 2.90 billion and it is being constructed with cooperation of the Asian Development Bank.

The term of the project contract has been extended by six months. It was set to be completed in November. More than 70 per cent of the project’s works has been completed, project chief Ghosh said.

[December 20, 2018 / thehimalayantimes.com]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries