energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Tanahun hydro project: Four companies submit bids for dam construction

Four different companies have come up with formal intent for the construction of structures, including dam in Tanahun hydropower project. Four companies, including a consortium of Nepali entity have submitted quotations for the construction of different structures in the 150-MW Tanahun Hydropower Project.

The companies submitted technical and financial proposals within July 7 – the deadline set by the project’s promoter Tanahun Hydropower Limited. The technical and financial proposal was solicited from interested companies in line with the Procurement Directives of the Asian Development Bank.

China Gejuwa Group Company Limited, China, Xino Hydro Corporation Limited, China, China National Electric Engineering Corporation Limited and Xong Da Corporation Vietnam Kalika Construction Nepal JV have submitted proposals for the same. Pradeep Kumar Thike, managing director of Tanahun Hydropower Limited, informed that the financial proposal of effective companies would only be opened following the assessment of technical proposals.

The evaluation of the technical proposals will be carried out by August-end and will be sent to ADB for consent and the financial proposal will be opened after ADB consent. As per the schedule, contract signing will be done within October 31 and contractors will be mobilized in the project site within mid-December. Tanahun Hydro on April 25 had re-solicited bids from international companies following termination of contract with Italian Company CMC for the construction of structures in the project.

The bidder in the first package is required to construct a 140-metre high concrete dam, two diversion tunnels and makeshift dams in the project site. However, Chinese Company Xino Hydro Corporation Ltd has already initiated works under the second package including construction of project tunnel, power house, supply of hydro mechanical and electro-mechanical equipments and installation and operation.

The Company now is constructing structures such as project site office building and staff quarter in addition to survey and design of project entrance gate and other infrastructures. Likewise, under the third package, contract signing has been done with Indian Company, KEC, for the construction of double circuit transmission line with 220 –KV capacity from Damauli to Bharatpur.

Total cost of the project is 505 million US Dollars. Loan agreement between donor agencies and Nepal government as well as auxiliary loan agreements between Nepal government and Nepal Electricity Authority (NEA) and NEA and the Company have already been signed. The project is aimed to complete its total construction by June-end of 2081.

[July 8, 2019 / khabarhub.com]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries