energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Locals threaten to disrupt hydel projects

Residents of the affected areas of two under-construction hydropower projects on Likhukhola that flows between Ramechhap and Solukhumbu districts have threatened to disrupt construction if their demands are not fulfilled.

The populace in affected areas of the under-construction Likhu-1 and Likhu-2 hydropower projects had submitted an eightpoint demand to MV Dugad Hydropower, a company developing the projects, about a week ago.

Now, they have warned that they will be forced to disrupt the work of projects unless their demands are met by November 16.

On behalf of the locals, Ramechhap’s Umakund Rural Municipality Ward No 1 Chairperson Nurbu Sherpa had submitted demands to the hydropower developer with 65 signatures of locals, warning of an agitation from the second half of November if their demands weren’t met by then.

The demands include free electricity to all the settlements in the ward, priority to locals for employment on the basis of qualification, upgradation of roads in the ward and support for education and health and drinking water in the ward. Further, they have also sought 20 per cent share of both the projects for locals.

The recent agitation threat comes not long after a compensation-related dispute here was resolved through an all-party meeting.

Umakunda Rural Municipality Vice-chairperson Urmila Karki Basnet, on her part, accused the projects of trying to move ahead without seeking cooperation of the rural municipality and blamed the project for multiple issues arising one after another.

Ramechhap Chief District Officer Lila Kumari KC Pande, however, disavowed any knowledge of the locals’ protest.

The locals have, however, said that they had informed the district administration and rural municipality about their demands.

The hydropower developer had started construction work of the projects three years ago.

While Likhu 1 is a 70MW project, 55MW will be produced from Likhu-2.

[Nov 12, 2019 / thehimalayantimes.com]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries