energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Locals threatento obstruct Bheri-Babai works

Say project not honoring its commitments

Locals of Bheri-Babai Diversion Multipurpose Project affected areas have become agitated, stating the many villages have been removed from the list of project-affected areas of Bheri Corridor Multipurpose Project – a complementary project of Bheri-Babai Diversion Multipurpose Project – among others.

They also complained that project conducted survey of the project and fixed compensation for land to be acquired for the project without consulting with the concerned local units. They have formed a pressure group, Bheri-Babai Diversion Concern Committee, comprising of representatives of Bheriganga, Gurbhakot and Lekbesi municipalities, and other stakeholders to pile pressure on the project officials. The committee on Wednesday submitted a 23-point charter of demands the Office of the Prime Minister and Council of Ministers and other line ministers through District Administration Office.

Bhupendra Bahadur Chand, mayor of Bheriganga Municipality who is also the coordinator of the committee, said that the locals had to start the protest as the project office failed to live up to its commitment that it had made when the project commenced. “Many villages have been removed from the list of project-affected areas. Also, project area has been surveyed and compensation amount determined without consulting local units,” he added.

Construction of rural roads, irrigation facility in fields lying within two kilometers of the main canal, electrification drive, infrastructure development and programs to create jobs for affected locals were some of the facilities promised to the locals when the Bheri Corridor Multipurpose Project was started.

Now the project has been downsized and renamed as Bheri Corridor Irrigation Project, according to Chand.

The first package of the Bheri-Babai Diversion Multipurpose Project – digging of 12.2 km tunnel from Hattikhola to Chiple for diversion of waters of Bheri River into Babai River – has already been completed. The project used tunnel boring machine to dig the tunnel for the first time in Nepali infrastructure history. The second phase of the project aims to irrigate 51,000 hectares of land of Banke and Bardiya. Building a 48-MW hydropower project is also a component of the second phase of the project.

The committee has warned that it would obstruct work in dam and powerhouse area if their demands are not addressed within 15 days.

Among others, the committee minister has demanded access to electricity for each affected household, shares of the project free of cost, allocate 50% of the amount earned by selling energy to the project-affected areas, guarantee employment for people of the affected areas, upgrading of Chinchu-Kohalpur Road (Ratna Highway), drinking water tap in each household and start work on Bheriganga Model City as per the master plan approved by the government.

Similarly, they have demanded the government to open a province-level industrial village and a hospital, among others, in the project-affected area.

[November 29, 2019 / nagariknetwork.com]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries