energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Melamchi project to be completed by mid-July

The Ministry of Water Supply (MoWS) has claimed that the much-awaited Melamchi Water Supply Project will be completed by mid-July.

Issuing a white paper on Melamchi Water Supply Project (MWSP) with an aim to clarify the status of the national pride project, Minister for Water Supply Bina Magar informed that the project has achieved 95.12 per cent physical progress as of today and Kathmandu dwellers will get water supplied from the project from mid-July.

The government had released a white paper on Melamchi Water Supply Project to clarify the project’s status after Italy-based Cooperativa Muratori e Cementisti (CMC) di Ravenna abruptly terminated the project in December 2018.

Though the construction of Melamchi Water Supply Project was started more than two decades ago, the project is yet to be completed.

Tiresh Prasad Khatri, executive director of Melamchi Water Supply Development Board, said that the target has been set to bring water from Melamchi River up to Sundarijal reservoir within mid-July. The budget for fiscal year 2019-20 had also announced to complete the Melamchi project within this fiscal year.

As stated in the white paper, the Melamchi Water Supply Project will cost Rs 31.36 billion while Rs 28.13 billion has already been spent for the project so far. “Kathmandu residents have waited for the project for years. However, the project will no longer remain a dream and will be completed within this fiscal,” said Minister Magar.

The fate of the Melamchi project had been uncertain ever since CMC left the project in December 2018

After almost one year since CMC left the water project, the government had brought in a Chinese company called Sinohydro to complete the remaining works of the project in November last year. The Chinese firm has been given a deadline of 12 months to complete the works.

“We are optimistic that the project will be completed within the deadline given to the contractor,” added Magar.

Sinohydro has been assigned the works related to headworks and tunnel finishing, diversion tunnel, lining of audit tunnel and finishing touches of the tunnel. Similarly, the company is also building infrastructure related to the water intake aspect of the project and also work on improving the access road. Furthermore, Sinohydro is also responsible for the design and construction of the coffer dam, repair of the camp site and installation of flushing systems in the project.

[Feb 13, 2020 / thehimalayantimes.com]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries