energyNP.com  
Tel
98510-91900¡¡
Email
energyNP@hotmail.com¡¡
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy
 
  Rural Electrification Project worth Rs 4 billion to start in Province 2

Kathmandu: A contract agreement has been signed to improve the electricity transmission and distribution system of eight districts in Province 2. The Nepal Electricity Authority (NEA) and Tata Project Limited on Wednesday signed a contract worth around Rs 4 billion for the implementation of the Province 2 Rural Electrification Project.

The project will work in Saptari, Siraha, Dhanusha, Mahottari, Sarlahi, Rautahat, Bara and Parsa of Province 2.

According to NEA, 8 substations of 33/11 KV, 16.6 MVA capacity with modern equipment will be constructed in order to make the power supply of the districts in Province 2 reliable and qualitative through the project. Similarly, two substations of 33/11 KV, 8 MVA capacity will be constructed.

In addition to this, the 323 circuit kilometers 33 kV transmission line, 950 circuit kilometers 11 kV line and 1000 circuit kilometers 400-volt line will be constructed in the districts of Province 2. The Norwegian government has provided a grant of 35 million US dollars for the implementation of the project. This grant will be provided through the Asian Development Bank.

Bodhraj Dhakal, the coordinator of the project, said the industry and household beneficiaries will be able to use enough and reliable electricity as the overall power transmission and distribution system of Province 2 will improve drastically after the completion of the work. He urged the contractor company to complete the work ahead of schedule as it is a high-priority project.

The construction contract agreement of the project is targeted to be completed within 900 days--30 months of the beginning of the implementation.

Project Chief of the Tata Project, Sandeep Kumar, expressed his commitment to move ahead with the goal of completing the work ahead of schedule. The Tata Project, India won the contract by bidding the lowest in the international tender called by the NEA.

The projects to be implemented through NEA Project Management Directorate have been divided into five sections.

[Mar 19, 2021 / nagariknetwork.com]¡¡¡¡¡¡
 
¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Electric Folded Treadmill Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries