energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Badera Substation At Final Stage, 15,000 Trees To Be Felled For Sunwal-Bardaghat Transmission Line

Nawalparasi: Some 15,000 trees of the local community forests are to be felled to clear ground for the 220kv new Butwal-Bardaghat transmission line. The transmission line is being installed with the investement of Rs. 650 million of the government of Nepal.

Ashok Pokhrel, information officer of the new Butwal-Bardaghat 220kv transmission line and sub-station project, informed that construction work of the substation of the 220kv transmision line at Badera, near Sunwal, in West Nawalparasi has entered the final stage and that a large number of trees needed to be cut down to expand the transmission line from Badera to Bardaghat, which is the second stage of the project.

To take the electricity line to the electricity centre at Bardaghat from the 220kv substation being beilt at Badera, Sunwal Municipality-12, plan has been made to stretch the transmission line along the basin of the Chure hills lying to the north of the East-West Highway, according to Pokhrel.

The area from which the transmission line is to be stretched falls under the community forest and that about 15,000 tress have to be cut down for expanding the transmission line.

The transmission line will be 21 km long from Sunwal to Bardaghat substation and this will go through Bardagoriya of Sunwal Municipality, wards no 1 and 3 of Saralwal Rural Municiaplity, wards no 2, 4, and 10 of Bardaghat Municipality. Similarly, trees of Chisapani community forest, Badera community forest, Baba Bardgoriya community forest, Bhagawati community forest, Kotai community forest, Dambarbhar community forest, among others, are to be felled to clear the way for the transmission line.

PowerChina Sepco1 Electrical Power Construction Company is building the transmission line which will have 60 towers in the stretch of 21 km and that the construction will be completed within two years.

Following the construction of the substation and the transmission line, electricity generated in hydel projects in the Kaligandaki basins will be connected with the national grid and it will make it easy for expansion of electricity supply in Nawalparasi, Butwal and Bhairahawa, which will in turn provide electricity in sufficient amount for the burgeoning industries in the area.

[11 April, 2021 / risingnepaldaily.com]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries