energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Postal Highway to miss yet another deadline as only 65 percent construction completed in over a decade

KATHMANDU, August 4:?The Postal Highway, one of the national pride projects, is going to miss another deadline of fiscal year 2022/23 as around 35 percent of the construction work is yet to be completed within the targeted deadline of the next two years.

The records of the Postal Highway Directorate show that only 65 percent of the total construction work has been completed so far in over a decade since the inception of the project. The construction of the 1,792 km long Postal Highway was started in 2009/10.

The Directorate’s report shows that an additional 208 km of the road stretch of the highway was blacktopped in the last fiscal year. Of the targeted 15 bridges for construction, only seven were completed during the period. While an additional 200 km road is under construction, the alignment of roads in many locations is yet to be finalised.

According to Project Chief Rohit Kumar Bisural, the problem has been observed mainly in contracting the bridges that fall along the highway.

The highway, also known as Hulaki Marga, extends 975 km from east to west. The project also includes an additional 817 km of roads that will connect all Tarai districts. The road connects 20 districts in the southern Tarai belt. It passes through a number of protected forest areas including Chitwan National Park, Banke National Park and Shuklaphanta National Park.

The national pride project was initiated in the early 1990s. However, it was only in 2004 that Nepal and India signed an agreement to conduct a study to upgrade the road networks linking the Postal Highway. The construction of the Postal Highway was estimated to cost Rs 25 billion. India has pledged to provide Rs 8 billion in grants while the government is investing the rest of the amount.

[4 August, 2021 / nagariknetwork.com]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries