energyNP.com  
Tel
98510-91900¡¡
Email
energyNP@hotmail.com¡¡
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy
 
  Thailand Egat to Import More Electricity from Laos

State-run Electricity Generating Authority of Thailand (Egat) plans to import an additional 1,200 megawatts of electricity from hydroelectric power plants in Laos under a long-term purchase contract.

Egat earlier signed a memorandum of understanding with the Lao Ministry of Energy and Mines (MEM) to buy a total of 9,000MW.Egat's current power supply stands at 10,200MW, said Jiraporn Sirikum, deputy governor of Egat.

Eight power plants in Laos with a combined power generation capacity of 5,420MW are committed to exporting electricity to Egat.

Seven of them -- with a capacity of 3,947MW -- are hydroelectric power plants, while the other is a 1,473MW coal-fired power plant.

Laos is also building Nam Theun 1 hydroelectric power plant with a capacity of 514MW. It is scheduled to start operating next year.

The 2018 national power development plan (first revision) states broadly that Thailand needs to import electricity from neighbouring countries, without specifying the countries or power generation projects.

Permanent energy secretary Kulit Sombatsiri said Thailand plans to import hydropower from Myanmar, but the neighbouring country's severe political conflict has delayed the plan.

The import of more power from "clean" resources is in line with the government plan to decrease its dependence on electricity generated by fossil fuels.

An energy source who requested anonymity said MEM has held talks with Egat on its proposal to build 10 new hydroelectric power plants across Laos.

The source said the Lao government and Egat may consider some projects they consider the most suitable and plan for the upgrading of Egat's transmission system.

Developing a hydroelectric power plant requires more than six years to complete, so the government needs to carefully plan for new development projects to avoid an oversupply of electricity, said Ms Jiraporn.

Power demand should continue to grow, which means there should not be an excess of power supply in the long term, she said.

[9 August, 2021 / world-energy.org]¡¡¡¡¡¡
 
¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Electric Folded Treadmill Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries