energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Construction of 220 kV Koshi Corridor Package-1 completed

Kathmandu: The construction of the package-1 of the Koshi Corridor 220 kV transmission line has been completed.

Under the Package-1 construction, a 220 kV double circuit tower has been pinned while single circuit stringing has been stretched from Inaruwa of Sunsari through Basantapur and Baneshwor up to Tumlingtar of Sankhuwasabha district. Nepal Electricity Authority (NEA) and India Exim Bank jointly announced the completion of the portion of the infrastructure project on Wednesday.

A total investment of US $ 112 million has been earmarked for the construction of the Koshi Corridor transmission line. Of the amount, the Indian bank has provided US $ 90 million as concessional loans to the state-owned power utility.

After the completion of the project, it can help transmit 1,000 MW of electricity each from Tumlingtar to Basantapur and from Dhungesanghu of Taplejung district to Basantapur district. In addition, it will also provide an access to flow 2,000 MW of electricity from Basantapur to Inaruwa. The transmission line is expected to serve as a reliable electricity distribution network in a number of districts of Province 1.

Speaking at a program, NEA Managing Director Kulman Ghising said the infrastructure has prepared the backbone for the distribution of electricity in Province 1. According to him, the authority will also be linking the Koshi Corridor and Kaveli Corridor transmission lines soon.

Citing an increasing production of electricity from the Koshi Corridor in the future, the NEA has planned to stretch a second circuit stringing and to improve the capacity of related substations through enhancement of power transformers. For this purpose, NEA is said to have sent a letter to India Exim Bank to inject an additional US $ 40 million.

NEA has divided the Koshi Corridor project in three packages for construction. The first package includes the construction of transmission stretch in Inaruwa-Tumlingtar, the second package includes installation of three sub-stations and the third package includes construction of a transmission line from Basantapur of Tehrathum to Dhungesanghu of Taplejung and related substations.

[7 October, 2021 / nagariknetwork.com]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries