energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  NEA investing Rs 25 billion to upgrade power system in Karnali, Sudur Paschim provinces

Kathmandu: The government has forwarded activities making a special plan for upgrading the power system in the hilly districts of Karnali and Sudur Paschim provinces.

A loan agreement was signed with the Asian Development Bank recently for the construction of the 132-KV Kohalpur-Surkhet transmission line in order to provide electricity to Karnali Province districts.

A high voltage transmission line is going to be constructed by upgrading the existing 33-KV transmission line. Although the transmission line from Kohalpur-Surkhet has 33-KV capacity, the transmission line from Surkhet to Kalikot has only 11-KV capacity, resulting in massive disruption in power supply during monsoon due to the low-capacity transmission line.

The Nepal Electricity Authority (NEA) has forwarded a strategic plan with the support of donor agencies to resolve this problem. The Ministry of Energy, Water Resources and Irrigation has set a target to provide electricity service in the districts that do not have access to the central transmission line.

The ministry has directed the NEA to work making a special package in order to provide electricity service to every house of the country. Finance Minister Janardan Sharma has also expressed commitment not to let a means and resources crunch in the upgrading and expansion of the transmission lines of Karnali Province.

A study is currently being carried out for the construction of an additional 220-KV transmission line linking Dailekh of Surkhet to Jumla. The NEA is going to invest Rs 25 billion for the same. A package has been made in order to carry out activities at government investment in Dolpa.

Executive Director of NEA, Kulman Ghising said that necessary works have been expedited in other districts by taking concessional loans from the European Investment Bank and AAIB. Only 43 per cent of the population of Karnali Province has access to electricity.

The NEA has given special priority keeping this situation of Karnali province in mind, shared Ghising. Similarly, out of 547,671 households in Sudur Paschim Province, 71.07 per cent households have access to the central transmission line.

[2 December, 2021 / nagariknetwork.com]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries