energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  85 percent upgrading work completed on Jomsom-Korala section

Galeshwor: As much as 85 percent works related to the blacktopping and upgrading of the Jomsom-Korala road section and 65 percent of the Beni-Jomsom section have been completed so far. The Beni-Jomsom road section is considered the lifeline of Gandaki Province.

Chief of Beni-Jomsom road section, Jagat Prajapati, said that the upgrading work of the Beni-Jomsom road in order to operate vehicles regularly even in the rainy season has been completed.

He said that motorable bridges are being constructed by replacing the Bailey bridges along the Beni—Jomsom-Korala road section.

Prajapati also said that along with the upgrading of the road section, eight motorable bridges have been constructed for the regular and smooth operation of vehicular movement. The Beni-Jomsom-Korala road section is a project of national pride.

"We have been constructing motorable bridges replacing Bailey bridges. We have proposed the construction of more bridges as per the need," he shared.

Some bridges are under construction over different big and tributary rivers of Myagdi and Mustang along the road section and it has become easier for the road users after the construction of the bridges.

A 40 meters long bridge has been constructed over the Rahughat rivulet, 40 meters long bridge over the Ghatte rivulet of Myagdi and a 115 meters long bridge over the Syang rivulet and a 50 meters long bridge over the Panda rivulet of Mustang, according to Prajapati.

Similarly, a 70 meters long and 80 meters long bridges have been constructed at Mahabhir of Annapurna Rural Municipality and Kaligandakai of Pokhar Bagar of Myagdi respectively.

[ December, 2021 / nagariknetwork.com]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries