energyNP.com  
Tel
98510-91900¡¡
Email
energyNP@hotmail.com¡¡
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy
 
  Dandakhet-Rahughat transmission line project moves forward

Beni: A contract agreement has been signed for the construction of the Dandakhet-Rahughat Transmission Line Project of 132 KV capacity. The transmission line is being developed by Nepal Electricity Authority.

The transmission line is set to link the power generated from Rahughat River and other rivers in the district in the national power grid.

Indian company Larsen & Toubro (L&T) Ltd has won the contract bidding for constructing the transmission line and substations linking Dandakhet of Malika Rural Municipality and Ambang of Raghu Ganga Rural Municipality in Myagdi district.

Project Chief Roshan Agrawal said that the contract agreement was signed on December 31, 2021 with the Indian firm for the transmission line construction at the cost of 26 million US Dollars.

The Asian Development Bank (ADB) has provided loan assistance for the construction of transmission lines and substations.

"The contractor has begun the tasks of design and survey immediately after the contract agreement," Agrawal said. The project is to be completed in 30 months.

As agreed, a total of 90 towers would be constructed in the 25 km long power grid.

In Myagdi district, four hydropower projects with the capacity of 172.8 megawatt have started the task of project development. Likewise, other licensed power developers are now expected to begin the construction with the preparations for transmission line development.

[7 January, 2022 / nagariknetwork.com]¡¡¡¡¡¡
 
¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Electric Folded Treadmill Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries