energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Pak-India Talks on Hydropower Projects End with Some Convergences

The three-day talks on hydropower projects between two nuclear states, Pakistan and India, here on Thursday ended with some convergences on important projects. However, the objections from Pakistan on 1,000 MW Pakal Dul under Article IX of the Indus Waters Treaty and 48 MW Lower Kalnai hydropower projects continue to exist. Pakistan also raised some more queries on clarifications by the Indian side on 624 MW Kiru project. India shared some data about the Kiru project. The talks were held under the Permanent Commission of Indus Water level.

Pakistan termed the design of spillways and free board of Pakal Dul and Lower Kalnai violative of the Indus Waters Treaty. However, India says that designs of the projects are in line with the provisions of Indus Waters Treaty. However, India agreed to hold another meeting on Pakal Dul with Pakistan by May 31, 2022.

Sources said that in the next meeting to be held before May 31 at the PCIW level, if the objections on Pakal Dul are not resolved, then next provisions of the Indus Waters Treaty would be exhausted, meaning that the issues of Pakal Dul will be taken on the government level. If it is not resolved at the government level, then Pakistan will either move the forum of Neutral Expert or International Court of Justice for the solution of the dispute. On the Lower Kalnai project (48MW), Pakistan wants the freeboard to be one meter in length, while India insists on a 2-meter length.

In the meeting, India informed the Pakistan side that the construction work on Lower Kalnai project has been stopped since the last flood damaged it. Now India is going to restart construction work but after its design was reviewed. However, Pakistan asked India to share its reviewed design on time and the Indian side responded positively.

Both sides spent the last day in finalizing and signing the minutes of the proceedings and the decisions agreed in three-day negotiations. This was the 117th meeting between the two countries at the PCIW level.

In the meeting, both parties discussed Pakistan’s question furnished under Article-IX on Pakal Dul and Lower Kalnai (48MW). Pakistan also raised objections on Tamasha Hydro Electric Power (HEP), Kalaroos-II HEP, Baltikulan Small, Darbuk Shyok HEP, Nummu Chilling HEP, Kargil Hunderman HEP, Phagla HEP, Mandi HEP, and Kulan Ramwari HEP. Most of these projects are being built on Pakistan’s main river Indus in Laddakh. Pakistan also sought the data on above-mentioned small hydropower projects of 25 MW each being constructed on Pakistan rivers. The Indian side said that the state governments are constructing these small projects and it will get the required data from them, which will later be shared with Pakistani authorities. The Indian side also said that it has shared some data about the small projects with Pakistan till February 24, 2022 and the Pakistan side acknowledged it.

Both sides also discussed the sharing of flood data, program of meetings and tours of PICW for the current calendar year 2022. During the talks Pakistan asked India to restore sharing of the flood data based on humanitarian grounds, which New Delhi continued to share from 1989 till 2018 and then started reducing the share of data with Pakistan in 2019. Pakistan pleaded that the flood data sharing is imperative for the Pakistan side to come into action on time to avoid catastrophic impact of flood on human lives. "The Indian side has agreed to restore the sharing of flood data on time, so that the Pakistan side could have ample time to help save human lives."

Both sides have also finalized the tours and meetings to be held in 2022 under the PCIW level and, to this effect, Pakistan asked India to also include a special visit of Kiru Hydropower project under the provision of Indus Waters Treaty. India agreed to arrange a visit to the Kiru project. The official said that Pakistan in August last year had pinpointed some observations about the design of the Kiru project with the capacity to produce 624 MW of electricity being erected on the Chenab River and sought some clarifications. India gave some clarifications, but Pakistan again raised some queries. India says that Pakistan should submit its queries on the project in written form and New Delhi will respond in 15 days' time. The Indian side raised the issue of storm drainage nullah namely Fazal Ka nullah, which enters Sutlej on Pakistan side from eastern Punjab in India.

[4 March, 2022 / world-energy.org]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries