energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Govt to prioritize reservoir-based hydro projects: PM Deuba

Kathmandu: Prime Minister Sher Bahadur Deuba said that the government would work for the development of large reservoir-based hydropower projects.

Addressing the inauguration ceremony of the 220-132 KV new Khimti substation completed under the Upper Tamakoshi Hydropower Project at Gogar in Dolakha earlier today, Prime Minister Deuba said that the development of Budhi Gandaki and West Seti reservoir projects will be expedited soon.

The Budhi Gandaki is a 1,200 MW-capacity hydropower project while West Seti Hydropower Project is with a capacity of 750 MW.

Prime Minister Deuba said that these projects were important for energy security for the country. He also said that large and reservoir projects were also necessary for clean and green energy and the government is making necessary homework for the same.

On a different note, Prime Minister Deuba also clarified that an appropriate decision would be taken regarding the Power Purchase Agreement (PPA) which has not been able to move forward for a long time. The energy entrepreneurs have been saying that the construction of the project has been disrupted due to the failure of PPA.

Prime Minister Deuba said that the Upper Tamakoshi Hydropower Project, built with Nepal's own investment and hard work, has made a great contribution to the supply of electricity. He thanked all the concerned employees and construction entrepreneurs for the completion of the project.

Upper Tamakoshi, a project of national pride, has so far generated one billion units of electricity. The project with a total capacity of 456 MW was inaugurated last June. Prime Minister Deuba thanked all those who helped in the project and urged them to use their knowledge and skills in other projects as well.

On the occasion, Nepal Electricity Authority (NEA) Executive Director Kulman Ghising said that the NEA is preparing to move ahead with big projects with the investment of Nepali people. He termed the Upper Tamakoshi Hydropower Project as a "game changer project" and said that it has also made significant contributions in improving the economic condition of the NEA.

[19 March, 2022 / nagariknetwork.com]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries