energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Industrialists warn of padlocking NEA office if electricity is not provided regularly

Morang: Industrialists warn to lock up Nepal Electricity Authority (NEA) if the problem related to electricity is not solved immediately along Sunsari-Morang Industrial Corridor. According to industrialists, NEA has disrupted power supply to the industrial area for more than 12 hours daily for the past few days without any notice.

Speaking at a joint press conference on Friday, the Morang Merchant Association, Industry Association and Confederation of Nepalese Industries (CNI) said that the industrialists have been facing major problems with electricity in recent times. They said that they would lock up the NEA if the power supply is not restored immediately.

"All the industries have been shut down as the power supply has been down for almost 24 hours since Wednesday,” said Nabin Rijal, President of Morang Merchant Association. “The industry has suffered huge losses due to unannounced power cuts. The goods that are in the machine and are being prepared for production are now useless.”

Rijal said that if the government does not solve the problem of electricity by Tuesday, they will be forced to padlock NEA on Wednesday and announce additional agitation programs from Thursday onwards.

The industrialists have also been demanding that the schedule of load shedding be made public, exploit maximum potential of domestic power generation capacity, ensure equitable distribution of electricity, abolish demand charges for electricity and find a solution through diplomatic initiatives. At least 500 industries along the Sunsari-Morang corridor have been affected due to the power outage.

[30 April, 2022 / nagariknetwork.com]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries