energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Process forwarded to build Butwal-Gorakhpur 2nd transnational transmission line

Kathmandu: The process to construct the proposed 400 kV new Butwal-Gorakhpur second transnational transmission line between Nepal and India has moved forward. The Nepal Electricity Authority (NEA) has got approval for foreign investment in the project.

Under the joint venture project of the NEA and the Indian Power Grid Corporation, a company will be established in India to do the construction work on the Indian side.

For it, the NEA has to manage Rs 736 million, which is 50 percent of the total budget. But, the NEA itself will bear the cost to construct the project on the Nepali side.

The double circuit transmission line is around 120 kilometers between New Butwal substation at Sunawal Municipality-13 in Nawalparasi district and Gorakhpur substation in India. Of the area covered by the project, around 20 kilometers fall in the Nepali side and the remaining in the Indian side.

NEA Executive Director Kulman Ghishing said that the permission to NEA for foreign investment has paved the way for establishing a company in India on joint venture of NEA and Power Grid for the development of a project.

“An article of association and regulation have been readied for the company establishment and with the obtainment of a permit for an investment from India, the establishment of the company will be moved ahead,” he said.

It may be noted that the seventh meeting of a mechanism of Nepal-India energy secretaries and joint-secretaries on October 14, 2019 finalized the investment model for the development of the transmission line.

The estimated cost of the project is Rs 7.039 billion and the final management will be ensured through 80 percent loan and 20 percent equity.

Preparations for bid documents are going on for the selection of a project developer and we plan to complete in three years of its commencement.

The NEA and Power Grid in August-September 2021 signed a MoU for joint investment.

A Cabinet meeting on August 3 allowed the NEA for an investment of 50 percent share in the construction of the transmission line segment toward India.

Nepal will construct the part of the transmission line in Nepal on its own while the section in India will be constructed on the joint venture of NEA and Power Grid.

The transmission will have the capacity of supplying around 2,000 megawatts of electricity.

[15 May, 2022 / nagariknetwork.com]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries