energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Govt to give priority to previous year’s big projects in new budget: Physical Infrastructure and Transport Ministry

Kathmandu: The Ministry of Physical Infrastructure and Transport (MoPIT) will not propose any new big projects in the fiscal year 2022-23.

The MoPIT has said that it intends to prioritize finalizing the multi-year big projects that are already under construction rather than advancing new big projects. However, the ministry would announce a few small-budget new projects.

The National Planning Commission and the Ministry of Finance have set a budget ceiling of Rs 162 billion for the ministry for the upcoming fiscal year. The ceiling is an increase of six billion rupees from that set for the current fiscal year. The ministry has planned its project for the upcoming fiscal year in accordance with this.

Shubha Raj Neupane, the Senior Division Engineer of the Planning Branch, Ministry of Physical Infrastructure and Transport, said that the ministry is proposing the budget for the upcoming fiscal year placing the East-West Highway and the Kathmandu-Terai Fast Track Road Project as a major priority.

The MoPIT has proposed a budget of Rs 30 billion for the Kathmandu-Terai Fast Track Road Project for the upcoming fiscal year. However, Nepal Army has demanded resources equivalent to Rs 48.84 billion.

Nepal Army estimates that the Fast Track project requires spending of 43.43 billion rupees in the upcoming fiscal year. Similarly, it estimates a budget of 39.02 billion for the project in the fiscal year 2024-25. Neupane said that the Ministry of Finance would be asked to make an additional budget available based on the portion of the budget that the project is able to spend in the budget of the upcoming fiscal year.

The MoPIT has also proposed appropriate budget allocation to the Ministry of Finance for the East-West Highway, a project being carried out in partnership with the Asian Development Bank.

In addition to this, the ministry has also proposed necessary budget allocation in the upcoming fiscal year for up-gradation projects such as Mugling-Pokhara, Kamala-Kanchanpur, Narayangadh-Butwal and Nagdhunga-Mugling Road Expansion and for national pride projects like Mid-Hills Pushpalal Highway and Terai Hulaki Marga that are dependent on physical infrastructures.

The MoPIT had allocated a budget of Rs 156.62 billion for the current fiscal year. So far, the ministry has spent 35.34% of the budget on capital expenditures. The total spending of the ministry as of now stands at 38.61% of the budget.

Neupane said that the war in Ukraine and the Construction Holiday of the construction dealers have, to some extent, contributed to the inadequate spending on capital expenditures in the current fiscal year. The ministry has said that it would give preference to studying the tunnel projects of the previous years rather than studying new tunnel projects in the upcoming fiscal year.

“While new dealerships may not be handed over for new tunnel projects, the cost-benefit analysis of these projects may be assessed in the upcoming fiscal year,” he said. “Construction of the tunnel projects takes considerable cost which is why it is likely that the study work for these projects is to be taken forward.”

[19 May, 2022 / nagariknetwork.com]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries