  The Year 2020/021: Dark Year Of NEA

If the recently published Audit Report 2022 of Nepal Electricity Authority by Auditor General is any indication, it shows how costly for the organization like NEA replacing the existing dynamic and dedicated head abruptly.

Serving four years as a managing director of NEA (2016-2020), Kul Man Ghising had transformed NEA a profitable public entity ending decades old load shedding. After taking the position of MD, Ghising had made NEA a profit making entity reducing the electricity leakage from 24 to 15.

However, his one year absence was a costly to the institution. As he left NEA in August 2020 July and Hitendra Dev Shakya took a charge of new MD, the process of NEA’s declining started. The audit period between July 2020-July 2021 showed how NEA was heading to financially collapse.

The Auditor General’s Annual Report 2022 showed that NEA’s suffered from high leakage, low profits and high remnant in the fiscal year of 2020-2021 (2077/078) fiscal year’s audit.

Submitted to the President Bidhya Devi Bhandari by Auditor General Tankamani Sharma Dangal an annual report of the Office of the Auditor General (OAG) for the fiscal year 2077-78 BS (2020-21) highlighted various transaction, performance and finance related issue of various government organizations including NEA.

According to the report, all financial indicators, which were upward and positive trends previously, were suddenly backtrack and negative results in the fiscal year of 2020-021

According to 59th Annual Report published on July 13, NEA’s leakage increased to 1.19 in the audit period of 2020-021 compared to the previous years. The report pointed out that the leakage was 15.99 in fiscal year 2077/079 and targeted to bring it down to 13.50. The report also pointed out NEA’s adamant to evaluate the situation hiring independent experts to improve the situation.

According to the report, NEA has made net profit of 10.05 billion rupees ( Rs.10,05,0000000) in the fiscal year (2076-077), However, NEA’s profit margin shrunk Rs. 7.68 billion (7,68,69,00000) in 2077—78.

NEA has earned Rs. 71, 2900000000 selling the electricity in the first year 2076-077 and the amount was Rs.70, 860000000 in the 2077/078 fiscal year.

In earlier fiscal year, NEA has purchased electricity worth of Rs.35, 12, 0000000. However, during the same period in 2077-078, NEA purchased electricity worth of Rs.40, 850000000. This is 16.32 years higher than the previous year. According to report, NEA had citied reasons for declining of internal production and increased the import.

According to report, NEA’s own electricity generation in the fiscal year of 2077-078 was 200.69 gigawatts hour lower than the fiscal year 2076/077. Similarly, IPP’s generation had increased by 304.22 gigawatts hour.

The report said that there are ample indications to show that NEA’s generation declined because the water dumped in the river from the dam at night. The report said this is share wastage of electricity.

The report also said that NEA was unable to refund remnant in fiscal year 2077/078 compared to 2076/077. Compared to a year ago, NEA’s remnant has increased by 13.17 percent in this period reaching the amount Rs.36.47 billion. Out of this, the NEA is yet to refund Rs.17.15 billion from 56 customers of feeder line.

According to report, NEA’s 47.08 percent of the remnant amount need to refund from the 56 customers connected to the dedicated feeder. With Rs.4.32 billion from street lights, NEA’s total remnant amount now is Rs.40.75 billion.

Despite the decision of NEA’s board of directors to collect the amount under an installment basis and direction of Public Account Accounted, NEA was unable to collect the money.

This report is a testimony of best financial performance of MD Ghising and after his successor’s period.

[14 July, 2022 / spotlightnepal.com]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries