energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  NEA expanding electricity transmission and distribution infrastructure in urban areas

Nepal Electricity Authority (NEA) is going to expand and improve the electricity transmission and distribution system in the urban areas of the Kathmandu Valley and Pokhara with the concessional loan from the Japanese government.

Five new substations of 132 kV capacity will be built with about 14.2 billion rupees (1.59 billion Japanese yen) received from the Japanese government. More than 15 km of 132 kV transmission lines will be laid underground in the urban areas.

With the help of Japan, substations of 132 /11 kV will be constructed at Thapathali, Maharajganj, Narayanhiti Palace Museum and Sirutar in the Kathmandu Valley and Birauta in Pokhara. The subsidized loan received for the implementation of the urban transmission and distribution system improvement project has an annual interest rate of 0.01 percent, 30 years of repayment and a grace period of 10 years. Through the implementation of the project, the transmission leakage in cities including Kathmandu and Pokhara will be reduced, the capacity of the distribution system will be expanded, and the power supply will be reliable and of high quality.

Finance Secretary Krishna Hari Pushkar, on behalf of the Government of Nepal, and Ambassador of Japan to Nepal, Kikuta Yutaka, on behalf of the Government of Japan signed the Exchange Letter and Record of Discussion for the implementation of the project on Wednesday. Similarly, the loan agreement was signed by Ishwari Prasad Aryal, joint secretary of the International Economic Cooperation and Coordination Division of the Ministry of Finance, and Okubo Akimitsu, senior representative of JICA Nepal.

Through the project, about 2 km of 132 kV transmission line will be brought underground from the substation at Teku in Kathmandu to the switching station at Thapathali. The Thapathali switching station will be removed and a 132/11 kV substation will be constructed there. The capacity of the substation will be 90 MVA.

9/10 feeders will be removed from the substation for power distribution. The 132 kV transmission line from Balaju substation will be brought to Narayanhiti Palace Museum via Maharajgunj through over 9 km underground cable. One each of 132/11 kV substations will be constructed at Maharajgunj and Narayanhiti Palace Museum. The capacity of the substation will be 60/60 MVA. Similarly, a 132 /11 kV substation will be constructed at Sirutar in Bhaktapur. The capacity of the substation will be 60 MVA. Similarly, 9/10 feeders will be taken out from all the three substations for local power distribution.

To make Pokhara's electricity supply reliable and qualitative, a 132/11 kV substation will be constructed in Pokhara Metropolitan City-17, Birauta. The authority will supply the electricity flowing from the Kaligandaki-Lekhnath 132 kV transmission line to the urban areas of ??Pokhara by constructing a substation at Birauta. About 600 meters of line from the transmission line to the substation will be underground. The land of Phewa Power Plant located in Birauta will be used for the construction of the substation.

[22 September, 2022 / nagariknetwork.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries