energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  NEA building infrastructure in Nepalgunj

The Nepal Electricity Authority is going to build a network of transmission and distribution infrastructures for sufficient, reliable and quality supply of power in Nepalgunj and Kohalpur areas of Banke district.

The Authority will build the infrastructure, including the high-level transmission and distribution lines in a phase-wise manner to meet the potential demand of electricity in Nepalgunj, Kohalpur and their surrounding areas till 2050, according to the NEA.

Based on the ongoing urbanisation and industrialisation pace in the Nepalgunj and Kohalpur areas, electricity consumption here is projected to reach 800 megawatts by 2050.

The NEA has planned to expand and strengthen the network of transmission and distribution systems in the Nepalgunj area to increase the domestic consumption of electricity and to supply sufficient, reliable and quality electricity.

To solve the immediate problem of power supply, the transmission and distribution system structures currently in operation will be upgraded and expanded.

The NEA said that 400, 220 and 132 kV high capacity transmission lines and substations would be constructed to address the long-term demand and the increased consumption of electricity.

A high-level team of the Authority led by its Managing Director Kul Man Ghising visited Nepalgunj on Saturday and Sunday and received information about the work that needed to be done immediately for the upgrading of the existing transmission and distribution lines and substations.

The team conducted on-site monitoring of the construction sites where the new lines and substations would be built .

The Authority said it would prepare a plan to be done immediately and in the long-term on the basis of potential power demand and proceed ahead with the construction of the required transmission and distribution lines and substations.

Ghising said that 11 and 33 kV lines and substations will be strengthened and expanded to solve the immediate problems facing by the consumers.

He clarified that necessary work is being done for the improvement of 33 and 11 kV lines.

As the current transmission and distribution systems do not bear the demand of electricity in summer, the consumers in Nepalgunj area have been facing problems such as low voltage, tripping and voltage down.

The Authority is going to construct a new substation of 132 kV in Kohalpur.

The land required for the construction of the substation has been acquired. Currently, the proposals of the bidders are being evaluated for the selection of the builders.

'We are studying the feasibility of expanding the South Corridor 400-220 kV transmission line from Lamahi in Dang to nearby the Rapti River to Banke, from Mainapokhri in Bardiya to Tikapur in Kailali to address the demand of electricity in the Nepalgunj region in the future, and we are also going to build a high capacity line from Kohalpur to Nanpara in India for more electricity trade with India,” he said.

[13 December, 2022 / risingnepaldaily.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries