energyNP.com  
Tel
98510-91900¡¡
Email
energyNP@hotmail.com¡¡
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy
 
  Mid-Modi hydro project test production goes successful

The test production of mid-Modi hydropower project that was constructed in Parbat has gone successful.

The 18-MW hydro project, constructed by the Middle Modi Hydropower Limited, has undertaken test production after eight years.

The hydropower project is making preparation to go for commercial production after successful test production, shared project chief Praveen Desar.

The project construction had begun in December 2014. "The construction was initiated in a way to complete the construction in three years. The construction time was elongated to five years due to several challenges in course of the construction", he noted.

The water flowing through Annapurna rural municipality-3, Birethanti of Kaski and nearby Modi rural municipality-1, Bhurungdanda of Parbat has been channelized to Modi rural municipality-2, Samadi of Parbat for the project purpose. Water has been brought through a tunnel with the length of 2,840 meters and is being flown to the Modi River through 70-meter long terrace.

As per the agreement, the Nepal Electricity Authority has constructed a four-kilometer-long transmission line from power house site to Deupur before the project construction completed.

According to Electricity Authority Parbat Distribution Centre, Shiva Narayan Goshali, the time period of 15-day after the completion of test production was kept as trial phase.

The power to be generated from Mid-Modi hydropower project would be integrated to the national transmission line after installing it to the 132-KV line.

The project cost has reached Rs 4.92 billion. The project estimated time was protracted due to recurring protests by project employees and citizens of the affected zone and natural calamities.

[27 December, 2022 / risingnepaldaily.com ]¡¡¡¡¡¡
 
¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Electric Folded Treadmill Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries