energyNP.com  
Tel
98510-91900¡¡
Email
energyNP@hotmail.com¡¡
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Lead Acid Battery
¡¡LiFePO4 Battery
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Juropani substation¡¯s operation improves power supply

A new 33/11 kV substation at Gauradaha Municipality-7, Juropani, in Jhapa district, has come into operation. The substation was constructed through the distribution system strengthening and expansion project under the Nepal Electricity Authority Project Management Directorate.

With the start of electricity supply from this substation, the problem of low voltage long faced by consumers from Gauradaha in Jhapa to the Indian border in the south is expected to be solved. Five feeder lines of 11 kV each have been taken out from Juropani substation connected with power transformer of 6-8 MVA capacity for local power supply.

Feeders of 11 kV have been connected from the substation to supply electricity in Gauradaha, Maharani, Baigundhura and Gaurigunj and one more feeder has been kept in reserve, said the NEA.

The substation was put into operation on Sunday. In the first phase, the Maharani feeder has been brought into operation; the remaining feeders will be brought into operation gradually.

At present, electricity has been supplied from Padajugi (Damak) 132 kV substation through 11 kV distribution line to Gauradaha, Juropani, Maharani, Gauriganj and other areas.

As the 11 kV distribution line was too long, there were problems such as low voltage and tripping in that area. After starting to supply electricity from Juropani substation, the problems faced by the consumers have been solved and the electricity supply has become sufficient, reliable and qualitative. Farmers in that area have been irrigating the fields by using electric motors.

Durga Datta Subedi, assistant engineer of the project involved in testing, operation and charging, said that the 280-volt line was supplied earlier, but after the 400-volt line started being supplied from the new substation, the electric equipment such as water pumps have started working well. About 18-km-long 33 kV line from Padajugi to Juropani is under construction.

In some places, the line could not be pulled due to the obstruction of local residents. As it is necessary to solve the problem of electricity supply in Gauradaha area, as an alternative system, a line has been taken from the side of Padajugi-Gaurigunj road and Juropani substation has been brought into operation.

The substation was built with the investment of the government and NEA, as well as with concessional loans from the Asian Development Bank.

[11 April, 2023 / risingnepaldaily.com ]¡¡¡¡¡¡
 

Lithium Iron Phoaphate (Lifepo4) Battery - Wall Mounted Energy Storage Lithium Battery - Nepal - Kathmandu

¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries