energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Consumption Of Per Person Electricity Will Be Increased To 450 kilowatt Hours

Minister of Finance Dr. Finance Minister said that the amount of imported fuel will be significantly reduced and electricity consumption per person will be increased to 450 kilowatt hours.

According to him, within a year 900 megawatts of electricity will be added to the national transmission. He the government will make necessary arrangement to reach 100% of the population within the next two years.

He said that after the completion of 111 MW Rasuwagadhi, 102 MW Central Bhotekoshi, 42.5 MW Sangen and hydroelectric and solar projects promoted by the Nepal Electricity Authority, about 900 MW electricity will be added to the national transmission system in the next financial year.

By the end of the next fiscal year, the total electricity production will reach 3,600 megawatts. According to him, the construction work of West Seti Hydropower Project, Seti River 6, Lower Arun and other hydropower projects, which are of strategic importance, will be progressed after signing the project development agreement.

He said that in order to meet the electricity demand of dry yam and to export hydroelectricity, the construction work of 1,200 megawatt capacity Budhigandaki and 635 megawatt capacity Dudhkoshi reservoir hydropower project will be decided and the construction work will be carried out.

Union, state and local level co-investment of Upper Arun with a capacity of 1061 MW, Chainpur Seti with a capacity of 210 MW, Jagdulla with a capacity of 106 MW, Tamakoshi Fifth with a capacity of 99.9 MW, Simbua River with a capacity of 70.3 MW and Ghunsa River with a capacity of 77.5 MW He said that the construction will be started.

Last year, the government allocated 75 billion 100 million rupees for the development of the energy sector.

This year, 87 billion 45 million rupees have been allocated. This year, the budget has been increased by 12.35 billion rupees for the development of the energy sector. As the budget was given only to the projects that were completed, the budget of the energy sector also decreased

The government has allocated a budget of 87 billion 45 million rupees to the Ministry of Irrigation, Water Resources and Energy for the development of the energy sector. The budget is 21 billion rupees less than the current year.

Finance Minister Dr. Mahat informed that the budget of the Ministry of Development such as physical infrastructure and energy has been cut after managing the budget only for the strategic projects that will be completed.

For the current year, a budget of 75 billion 10 million rupees was allocated for energy. Similarly, 33 billion 500 million rupees were allocated towards water resources and irrigation.

The government has prepared the budget for the financial year 2080/81 with the slogan of the second phase of economic reform and structural change of the economy said Dr. Mahat.

[29 May, 2023 / spotlightnepal.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries