energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Thirteen hydropower projects were damaged by recent flooding

The Independent Power Producers’ Association – Nepal (IPPAN) reported that 13 hydropower projects were damaged by floods on Ashad 1 and 2. According to IPPAN, these projects have a total capacity of 150 MW, which has been affected.

IPPAN claims that 13 projects, both under construction and completed, located in Sankhuwasabha, Taplejung, and Panchthar districts in the Koshi Province, have suffered damage, resulting in a loss of 150 megawatts of capacity. In Sankhuwasabha, the damaged projects include those built in the Hewa River, Piluwa River, and Sava River basins, namely Upper Hewa Khola-8.5 MW, Hewa Khola-4.5 MW, Super Hewa Khola-5 MW, Upper Piluwa Khola-4 MW, Down Piluwa-9.9 MW, Piluwa Khola-5 MW, and Sava Khola-4 MW.

Furthermore, 14 laborers and employees working on the Super Hewa Khola project have gone missing, and four individuals have been found dead. Similarly, projects constructed in Taplejung and Panchthar districts in Ingwa, Ewa, Kabeli, and Hewa river basins, including Iguwa Khola-10 MW, Iwa Khola-10 MW, Kabeli B-125 MW, Kabeli B-1 Cascade-10 MW, Hewa Khola-A-15 MW, Hewa Khola-5 MW, and Lower Hewa Khola-22 MW, have also been damaged by floods, as stated by IPPAN.

Since these damages occurred within just two days of the monsoon’s arrival, IPPAN has urged the hydropower promoters and all project employees to exercise extreme vigilance and remain on high alert. In order to address the aftermath of the flood damage, IPPAN has requested immediate relief efforts and the search for missing persons from the local administration and government.

[20 June, 2023 / nepalenergyforum.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries