energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Dordi Corridor Transmits Over 126 MW of Electricity to National Grid

The Dordi Corridor helped supply 126.84 MW of electricity to the national grid in the past 10 months.

After the 132 kV double circuit transmission line came into operation, the corridor evacuated the aforementioned amount of electricity produced by five different hydropower projects.

Ramesh Poudel, chief of the Dordi Corridor Transmission Line Project, said the infrastructure has prevented the produced electricity from going to waste since August 2022. The corridor incorporates four hydropower projects constructed in Dordi Khola and one in Chepe Khola.

The 54 MW Super Dordi ‘B’ project promoted by People’s Hydropower Company, 27 MW Dordi Khola promoted by Himalayan Power Partner, 25 MW Upper Dordi ‘A’ promoted by Liberty Energy Limited and 12.1 MW Dordi-1 promoted by Dordi Khola Jal Bidyut Company are the installed hydropower plants in Dordi Khola. Similarly, the 8.83 MW Chepe Khola Small Hydropower Project has also been supplying its produce to the corridor.

Since last month, the 54 MW Super Dordi ’B’ has come into operation. Arjun Prasad Gautam, a promoter of the project, said the delay in completion has raised the cost of the project from Rs 8.80 billion to Rs 10.50 billion.

Super Dordi ’B’ started its construction in September of 2015. The project was supposed to complete its construction by 2019.

Similarly, the production of 25 MW Dordi ‘A’ has been connected to the Dordi Corridor after it came into operation just two weeks ago. The hydropower that was supposed to start its production six years ago, witnessed a total investment of Rs 4.64 billion.

[29 June, 2023 / nepalenergyforum.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries