energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Prime Minister assures of addressing demands raised by IPP

Prime Minister Pushpa Kamal Dahal ‘Prachanda’ has said the government would take maximum efforts to address the demands being raised by the power producers.

During the meeting with office-bearers of the Independent Power Producers’ Association, Nepal (IPPAN) at the official residence of the Prime Minister, Baluwatar, today, Prime Minister Prachanda mentioned that the government would take initiatives to provide compensation to the projects damaged by landslide and flood.

He shared that necessary preparation and initiatives were underway for the implementation of agreements made during his recently held India visit.

The Prime Minister also assured of addressing some of the policy-level and topical issues raised by the power producers.

On the occasion, IPPAN demanded to provide refinancing from Nepal Rastra Bank for the reconstruction of the damaged hydropower projects, to extend the deadline to produce electricity by two years and to provide discounts in customs and VAT in the import of machines and spare parts required for the reconstruction.

IPPAN President Ganesh Karki said they also demanded the Prime Minister to make necessary arrangements to provide 50 per cent amount in advance from insurance based on preliminary details of the ‘surveyor’ as well as to reschedule the loan taken for the reconstruction of the projects up to 20 per cent.

The power producers also demanded to create an energy development-friendly environment, to sign a power purchase agreement with projects that have filed applications at the Nepal Electricity Authority and to pass the Electricity Act immediately, added Karki.

[8 July, 2023 / nepalenergyforum.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries