energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Budhigandaki affected want immediate start of project work

The affected people of Budhigandaki hydropower project have requested their representatives to take initiative to start the project work immediately.

During the meeting with members of the House of Representatives (HoR), Ramnath Adhikari, who reached there for a meeting with the affected residents of Arughat and its surrounding areas, project affected people said that they want to see the 1,200 MW Budhigandaki hydroelectricity project started as soon as possible and completed in time.

The local residents requested to start the stalled construction development works in the affected areas as it will take some time to complete the project.

Umesh Shrestha of Arughat, Dhading, said that it is crucial to build the project and for that, immediate resumption of stalled infrastructural work is imperative.

Shrestha said that the compensation distribution and rehabilitation plans that have been stopped should be moved forward immediately. Sujan Shrestha of the same area said that as Arughat market is a historical market, it is necessary to shift the market to another place considering its importance.

Most of the residents of the affected areas of Gorkha and Dhading emphasised on the rehabilitation programme.

There is a complaint of the affected residents that despite getting land compensation, there is no guarantee of housing.

Raju Upreti, Chairman of Tripurasundari Rural Municipality, said that after Prime Minister Pushpa Kamal Dahal inaugurated the field office of Budhigandaki Hydropower Project Company Limited in Siurinitar, the people are excited and looking forward to its completion.

After listening to the complaints of the people, MP Adhikari said that he would put pressure on the government to start the construction of the project immediately by solving the problems of all the citizens of the affected areas.

He said that he would raise his voice for the preservation of Arughat, the old commercial centre in Tripurasundari Rural Municipality, religious monasteries and temples and their relocation in an effort to keep their importance intact.

Citing the project’s significance not limited to Gorkha and Dhading residents but crucial for the overall economic development of the country, the parliamentarian requested everyone to help from their sides for the construction of the project.

[25 July, 2023 / nepalenergyforum.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries