energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Pakistan Tarbela 5th Extension Hydropower Project: Wapda Chief Asks Contractor to Chalk Out Recovery Plan

Chairman WAPDA Engr Lt Gen Sajjad Ghani (r) has directed the contractor to chalk out a recovery plan and implement it in letter and spirit for completion of the 1530 MW-Tarbela 5th Extension Hydropower Project according to the schedule.

The Chairman stated this while reviewing construction progress at various sites of the project on Wednesday.

A delegation of the World Bank and Asian Infrastructure Investment Bank also accompanied him. Member Water, Member Power, GM (Coordination and Monitoring), GM Tarbela Dam Project, PD Tarbela 5th Extension and Project Managers of the Consultants and the Contractors were present on the occasion.

The Chairman had a detailed visit of the key sites which include powerhouse, tail race tunnel and downstream coffer dam etc. He expressed satisfaction over completion of the up and downstream coffer dams before the onset of current high flow season.

Completion of the downstream coffer dam has made it possible to continue construction work on the powerhouse and the tail race despite opening of the service spillway of Tarbela Dam during the ongoing high flows, the Chairman said.

The Chairman was briefed that excavation of the powerhouse and the tail race tunnel as well as slope stabilization for the switch yard are in progress.

While modification in the existing Tunnel No. 5 is also going on. Detailed presentations were also made to the Chairman about the progress of civil and electro-mechanical contracts of the Project.

Tarbela 5th Extension Hydropower Project is a component of green, clean and least-cost energy generation plan, WAPDA is implementing on priority. World Bank is providing US$ 390 million and Asian Infrastructure Investment Bank US$ 300 million for construction of the Project.

Electricity generation from the project will start in 2025. With completion of Tarbela 5th Extension, installed capacity at Tarbela Dam will increase from 4888 MW to 6418 MW.

by brecorder

[24 August, 2023 / world-energy.org ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries