energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Lower Arun Hydropower Project’s Capacity Increased to 669 MW and cost to 92.67 Billion

The production capacity of Lower Arun Hydropower Project has been increased. The installed capacity of the project has been increased from 474.25 MW to 669 MW.

The supplementary environmental impact assessment report of the project has been released for comments. The Ministry of Forests and Environment has published a supplementary environmental impact assessment report.

Due to changes in project design and components along with capacity, the area of ??land and the number of trees to be felled have also changed. But the cost has not changed that much.

Lower Arun is a run-of-river project. The gross head and net head of the project will be 216m and 213.3m respectively. The penstock length will be 580m. The penstock diameter will be 6.1m. The project is expected to generate 3,561 GWh of electricity.

According to the report, the 344.68 cubic meter/second flow coming out of the Arun 3 project tailrace on the left bank of the Arun river will be sent directly from the head pond through the intake gate to a 17.4 km long horseshoe-shaped tunnel with a diameter of 10.5 meters.

444 households will be affected by the proposed project. Affected households will be economically and physically displaced. 184 hectares of land will be required for the project. In which private land is 107 hectares, forest area is 70 hectares and government land is 6 hectares.

There has also been a big change in the number of trees being felled. In the previous report, there were 7,665 trees, now there are 16,198 trees.

The construction period has been reduced from 7 years to 5 years. The cost has increased from NPR 92.12 billion to NPR 92.67 billion.

[4 September, 2023 / nepalenergyforum.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries