energyNP.com  
Tel
98510-91900¡¡
Email
energyNP@hotmail.com¡¡
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy
 
  NEA signs PPA with Sangrila Hydropower Pvt Ltd for Jaldigad hydropower project

A Power Purchase Agreement (PPA) has been signed for the 20.73 MW Jaldigad hydropower project to be built in Rukum East. The project promoter Sangrila Hydropower Pvt Ltd and Nepal Electricity Authority (NEA) signed a PPA on take and pay model for 6 months of winter and 6 months of rainy season.

The agreement stipulates that the NEA will purchase electricity generated by the project at the rates of Rs 8.40 during the winter and Rs 4.80 during the rainy season. On behalf of the project, Chairman of Sangrila Hydropower Pvt Ltd Khagendra Neupane and Deputy Executive Director Pradeep Kumar Thike on behalf of the Electricity Authority have signed the agreement.

Shangrila Hydropower Pvt Ltd has gathered a group of accomplished entrepreneurs who have thrived in various sectors, including Khagendra Neupane, Secretary of the Non-Resident Nepali Association (NRNA) ICC. This dynamic team also includes RK Sharma, Vice President of NRNA ICC and a successful businessman, Raj Regmi, Youth Vice President of NRNA and a young entrepreneur based in Qatar, Naveen Kandel, businessmen Rabin Gurung, and Saroj Dhital. Neupane said that the project will move forward with team's agility and strong teamwork.

Chairman Neupane also said that NRNAs and successful Nepali businessmen from various sectors will heavily invest in the hydropower project. The project to be built in Ward No 3 and 4 of Rukum East Aathbiskot Municipality will be situated along the Jaldigad river.

From the power station to the Nepal Electricity Authority's Bafikot substation, it will be connected to a 132 kV substation or a 400 kV substation at Jajarkot Daanepipal, which is 8 km away from the project site. According to the project, the access road leading to the project has been opened and needs to be upgraded. The estimated cost of construction of the project is Rs 4 billion. The estimated construction cost for the project is Rs 4 billion, with an expected annual electricity production of 127.29 gigawatt hours.

[16 September, 2023 / nagariknetwork.com ]¡¡¡¡¡¡
 
¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Electric Folded Treadmill Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries