energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Flash Floods in Teesta Basin Impact Central Hydropower Projects in Sikkim

India’s Ministry of Power is closely monitoring the aftermath of flash floods in the Teesta Basin of Sikkim, which has left a significant impact on central hydro power projects in the region. In an emergency meeting held on Wednesday, Shri Pankaj Agrawal, Secretary (Power), along with senior officials from the Ministry of Power and the Central Electricity Authority, discussed the situation with the National Hydroelectric Power Corporation (NHPC).

The flash floods, occurring in the night of October 3rd and 4th, 2023, resulted in the submersion and destruction of all bridges downstream of the Teesta-V Hydropower Station up to Tarkhola/Pamphok. This has had a severe impact on transportation and communication in the affected areas. The floodwater overtopped the dam of the Teesta V Power Station, with all roads leading to the project sites and parts of the residential colony sustaining significant damage. As a result, the power station is currently shut down and not producing electricity, with NHPC evacuating its workforce on all projects and ensuring their safety. Tragically, one casualty was reported from the Teesta V power station.

The ongoing construction of the Teesta VI hydro project, which has a capacity of 500MW, has also been disrupted by the flooding. The floodwaters infiltrated the powerhouse and transformer cavern, while key bridges connecting the right and left banks of the barrage and the Power House were washed out. Two crane operators working on the project site are currently missing, and all possible efforts are being made to locate them.

While the Teesta Low Dam - III Hydropower Plant (TLDP-III) and TLDP-IV, both located in downstream West Bengal, did not suffer major damage, they remain shut down due to heavy siltation brought by the floodwaters. NHPC is working to restart electricity generation at both of these projects in the coming days. Fortunately, no damage has been reported in the Rangit valley, where NHPC's Rangit IV power project and Rangit Power Station are situated.

A detailed assessment of the extent of damage at all project sites will be carried out once the water levels recede. NHPC, in collaboration with the state government, disaster management authorities, and the district administration, is making every possible effort to maintain the supply of essential commodities such as food, medicine, and electricity to the affected regions.

The Central Government has committed to conducting a thorough evaluation of the damage to these vital hydropower projects as the floodwaters recede. NHPC said it is working tirelessly to expedite the restoration of these projects, ensuring that they are operational at the earliest opportunity.

by waterpowermagazine

[7 October, 2023 / world-energy.org ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries