energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Kathmandu Metropolitan City Tops List of Local Levels with Unpaid Street Light Dues

The Nepal Electricity Authority (NEA) has said that 332 local levels are yet to settle their outstanding electricity tariff dues for the usage of street lights.

In a notice, the NEA has made public the names of these local levels that have not fulfilled their street light fee obligations.

The NEA has issued a warning, stating that if the outstanding fees are not cleared within 45 days, legal actions will be taken against the defaulting entities.

Surprisingly, even prominent metropolitan cities like Kathmandu Metropolitan City have not paid their dues to the NEA for utilizing street lighting services.

According to NEA, a staggering amount of NPR 6,894,311,000 is yet to be collected from 332 local levels across the nation for their usage of electricity for street lighting purposes.

The NEA has reiterated its commitment to enforcing the rules, stressing that if local levels fail to settle their street light fees within the specified timeframe, appropriate actions will be initiated.

Furthermore, the NEA has issued a reminder to local levels, urging them not to install street lights arbitrarily without utilizing meters for accurate billing.

Kathmandu Metropolitan City alone owes a substantial sum of NPR 1,031,629,877 to the NEA.

Other major municipalities are also among the debtors, with Biratnagar Metropolitan Municipality owing NPR 86,668,707, Lalitpur Metropolitan Municipality owing NPR 244,413,047, Birgunj Metropolitan Municipality owing NPR 172,869,465, Pokhara Metropolitan Municipality owing NPR 13,351,472, and Bharatpur Metropolitan Municipality owing NPR 10,062,330 in unpaid street light fees.

Source : KhabarHub

[8 October, 2023 / nepalenergyforum.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries