energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Japan agrees to construct tunnel and flyover at Koteshwar-Jadibuti section

The government is going to build a flyover and a tunnel to ease the traffic jams at Koteshwar Chowk that has become an everyday problem in Kathmandu's traffic management. For this, the estimated cost is about Rs 25 billion.

Although the government announced this project in its policies and programs for the fiscal year 2017/18, it was not finalized technically. After a study by the Japan International Cooperation Agency (JICA), Japanese Cooperation Mission, the project is now ready to move forward.

According to that, the government is doing homework to negotiate a loan agreement to build a structure with a flyover tunnel (underpass) in the Jadibuti-Koteshwar-Tinkune section.

During morning-evening peak hours in Koteshwar, the vehicles here encounter long traffic jams. The government assigned the JICA to suggest ways to solve this problem.

It is said that the government has chosen one of the three technical options given by JICA in Koteshwar. The Department of Roads (DoR) has chosen the option of constructing an underpass in the middle section including Koteshwar Chowk and constructing a flyover at Tinkune and Jadibuti.

The first two options given by JICA were major infrastructures to connect ring roads. The first option was to build a 1.3 km flyover at a cost of Rs 9 billion on the ring road from Tinkune to Balkumari. The second option was to build a two-way tunnel of Rs 24 billion, 1.2 km crossing the Koteshwar Chowk.

The third option involved the construction of a two-way tunnel with a flyover at a cost of approximately NPR 24 billion. JICA's study indicated that this option would keep the ring road traffic flowing uninterrupted. Consequently, the government is preparing to secure a loan from JICA for this project.

JICA presented the initial report of the study in October 2019. Accordingly, JICA has given the final report. According to this, the loan agreement will be signed soon, said Bijayakumar Jaisi, the Head of the Development Cooperation Implementation Division of DoR.

According to Jaisi, a flyover will be constructed from Manohara Bridge to Pepsicola Chowk. A 600-meter tunnel will be built from Jadibuti to the Munibhairav temple endpoint at Tinkune.

This tunnel will pass beneath the area housing the airport's runway signal lights, without impacting the runway itself.

The project envisions connecting the flyover at the tunnel's entrance to the Munibhairav temple in Tinkune and extending it to the Bagmati Bridge. This design includes the construction of approximately 500-meter-long flyovers on both sides.

[21 October, 2023 / nagariknetwork.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries