energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  NEA Expands Transmission Lines by 3100 Circuit Kilometers in Nine Years

The Nepal Electricity Authority (NEA) has added 3,118 circuit kilometers of transmission lines to the electricity transmission system of the country in the last nine years.

Transmission and distribution lines and substations are required to deliver the electricity produced from the power plants to the customers' homes. For this purpose, the NEA is constructing transmission lines and substations through the Directorate of Transmission and Project Management.

Nine years ago i.e. in the fiscal year 2071/72, the capacity of substations was only 2,132 MVA, but in the year 2079/80 it reached 8,867 MVA.

In the year 2071/72, electricity was being transmitted only from 66 and 132 KV transmission lines but now it is done through 66, 132, 220 and 400 KV lines. In the year 2071/72, there were 2,624 circuit kilometers of transmission lines. By FY 2079/80, the country has 5,742 circuit kilometers of transmission lines with the addition of 3,118 circuit kilometers of new lines.

Currently, the length of 66 and 132 kV transmission lines in the system is 514 and 3,979 circuit kilometers respectively.

Similarly, the length of 220 and 400 KV transmission lines is 1,101 and 148 circuit kilometers respectively. Last year, 413 circuit kilometers of transmission lines were added to the system.

Kulman Ghising, the executive director of the NEA, has admitted that there are problems in the construction of transmission line projects, mainly due to the obstacles created by the locals. In addition to this, there are also problems in land acquisition and use of forest area and tree cutting, and the NEA is working to solve these problems, added Ghising.

"On one hand, it takes a long time for the approval of the use of forest area land and tree felling, and on the other hand, a large amount of money has to be paid as compensation to another agency of the government. This not only prolongs the duration of the project, but also increases the price of our produced electricity," said Executive Director Ghising.

There is an urgent need to declare the next 10 years as the country's development decade and comprehensively amend or replace the existing laws and regulations, to facilitate the land use of the forest area, said Ghising, adding that the programs announced in the current fiscal year's budget should be implemented as soon as possible.

In order to meet the demand for electricity till 2050, Ghising said that the major cities of the country including Kathmandu have been divided into 11 clusters for which the NEA has prepared the transmission and substation structure master plan.

According to the NEA, currently 2,852 circuit kilometers of transmission lines of various capacities are under construction. A maximum of 1,111 circuit kilometers of 132 KV transmission lines are under construction. Likewise, 988 and 754 circuit kilometers of 220 and 400 KV transmission lines are under construction respectively.

Similarly, 10,469 MVA capacity substations of various capacities are under construction while 15,564 MVA capacity substations are proposed for construction.

[20 November, 2023 / newbusinessage.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries