energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Pakistan PAEC Seeks Nod for 1200MW Chashma Nuclear Power Plant Unit-5

Pakistan Atomic Energy Commission (PAEC) has sought the National Pow-er Regulatory Authority’s approval for the grant of Generation Licence for its proposed 1200 MW Chashma Nuclear Power Plant Unit-5 (C-5).

The PAEC has sub-mitted an application with Nepra for grant of Generation Licence for its proposed Chashma Nuclear Power Plant Units-S- (C-S).

The Authority has considered the matter and decided to treat it as an application for concurrence pursuant to Section 14B(S) of NE-PRA Act, said Nepra.

The Authority has registered the applica-tion and decided to seek comments of stakehold-ers, interested / affect-ed persons and the gen-eral public in favour / or against grant of concur-rence to PAEC for C-5. Nepra has asked the stakeholders to sub-mit their comments to the office of Registrar Nepra within a period of 15 working days. In June 2023, China and Paki-stan had signed a Mem-orandum of Understand-ing (MoU) for a 1,200 MW Chashma-5 (C-5) nuclear power proj-ect worth $3.48 billion. The estimated comple-tion time of the proj-ect is 2029. The proj-ect will have one unit and its generation ca-pacity will be 1117 MW. The ground-breaking ceremony for the 1200 MW was performed by former Prime Minister Shahbaz Sharif in July this year. The project is located at Mianwali, Pun-jab. The Chashma Nucle-ar Power Generation Sys-tem (CNPGS) hosts four nuclear power plants. CN-PGS Unit 1 (C-1) and Unit-2 (C-2) have a gross capac-ity of 325 MW each. C-1 started operation in 2000, while C-2 in 2011. CNPGS Unit 3 (C-3) and Unit-4 (C-4) both with gross capaci-ty of 340 MW each started commercial operation in 2016 & 2017, respectively.

[9 December, 2023 / world-energy.org ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries