energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Construction of Hetauda-Inaruwa 400kV transmission line in progress

The work of the Hetauda-Dhalkebar-Inaruwa 400 kV transmission line project, which has been stalled for seven years in Lalbandi Municipality-12, Jiyajor of Sarlahi, has progressed.

The work had stopped in the Jiyajor area for seven years due to obstruction of the locals regarding the conflict over the distribution of land compensation. The foundations of eight towers are yet to be dug in this place, while the foundations of three towers have already been laid.

After many discussions with the locals, the dispute over compensation has yet not been resolved, and now security personnel have been deployed for the construction of towers. Since last Wednesday, under the security of the Nepal Police and the Armed Police, construction of the foundation of the Tower has been ongoing in full swing.

Shyam Kumar Yadav, chief of the Hetauda-Dhalkebar-Inaruwa 400 kV transmission project, said that the work that halted in the Jiyajor section has moved forward. Under the Dhalkebar-Hetauda section of this transmission line, the work stopped at Jiyajor in Sarlahi and Hatiya in Makwanpur due to the obstruction of locals.

Among them, the work of the Jiyajor area has progressed. The Nepal Electricity Authority has planned to complete the entire work of the transmission line within the next three months.

After the Nepal Electricity Authority started the work by deploying the police, the locals went to the District Administration Office, Sarlahi on Thursday and again demanded the proper compensation.

Durga Bahadur Ale Magar, ward chairman of Lalbandi Municipality-12, who reached the District Administration Office with the locals, said that attention has been drawn to address the demands of the residents.

Ward chairman said that they have demanded compensation for the acquisition of the land where the tower will be located, along with the compensation for the land occupied by the wires and also for the crops that will be damaged.

There has been no disturbance from the locals in the Jiyajor area for the past three days, and construction work is going on smoothly. Chief District Officer of Sarlahi, Komal Prasad Dhamala said that the work has progressed after the locals were explained about the benefits of the transmission line.

[24 December, 2023 / risingnepaldaily.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries