energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  NEA chief Ghising insists on making 61 manufacturers clear dues of dedicated feeders and trunk lines

Despite the provisions offered to settle discounted bills of electricity use, none of them appealed for a review, just to default their dues: Ghising

Nepal Electricity Authority (NEA)’s Managing Director Kulman Ghising has insisted on recovering the electricity tariff dues from manufacturers who were supplied power through dedicated feeders and trunk lines, despite pressure from those manufacturers to revoke his decision.

Organizing a press meet on Thursday, Ghising said he will deliberately cut the electricity supply to the manufacturers that fail to clear their dues on the headings. “Factories cannot back off from paying the dues of electricity tariffs that they had used; rather the NEA will be flexible on allowing them to settle their outstanding amounts in installments,” he said.

NEA chief Ghising made his stance at a time when the dispute between the state-owned power utility and industrialists, over the issue of the dues for using dedicated and trunk lines, has mounted after the power utility cut electricity supply to nine manufacturers in the past few days.

According to the NEA, it cut electricity supply to nine manufacturers, which have dues worth Rs 12.50 billion in total. “We will be gradually disconnecting the power supply to other firms that have been refusing to clear the outstanding amounts,” Ghising said.

Of the firms that have outstanding amounts to pay to the NEA for using electricity supplied through dedicated feeders and trunk lines, Jagadamba Steel is yet to pay Rs 4.14 billion, the highest of all. Jagadamba Enterprises, Narayani Spat Mills and Shree Siddhi Laxmi Steel were provided the trunk lines facility even after the end of the load-shedding. The collective dues of these firms amounts to Rs 1.31 billion, according to the NEA.

The NEA records show that out of 239 production-based entities, which had utilized the special facility provided by the authority, 178 have already cleared their electricity bills. Out of these, 61 firms have been pressurizing the NEA to take back its decision.

The private sector firms have been criticizing the NEA for pressuring them to pay tariffs ‘arbitrarily’. They have been demanding the NEA present the evidence of their dues based on the electricity consumption using Time of Day (ToD) metering, which the NEA has refused to disclose till date.

The NEA on the other hand has been unable to provide its evidence of the TOD meter readings in support of its claim. In a letter submitted to the Sunsari District Court on September 28, the NEA stated that it cannot provide download data for that period because the new data from the TOD meter replaced the old data.

On August 30, the court issued a letter to the NEA regarding the reference to Reliance Spinning Mills. While replying to the same letter, the NEA officials admitted that they did not have any records of the TOD meter.

As per the Electricity Distribution Regulations of 2069 BS, if technical issues with a customer's TOD meter result in inaccurate consumption readings, causing billing discrepancies, the amount will be discounted based on the analysis of the meter's download data. However, the NEA has stated that it does not have access to the necessary download data.

Ghising said the NEA customers can appeal against the provided discount facility defined by the regulations. According to him, the 61 firms were also informed about the provisions stated in the law. “However, none of them had filed applications for reviewing the discounted bills issued by the NEA,” he added.

[29 December, 2023 / nagariknetwork.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries