energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Dedicated and trunk line dues can be paid in a maximum 60 installments

The Nepal Electricity Authority (NEA) has arranged for consumers who used electricity from dedicated and trunk lines to pay the electricity consumption tariff through discounted billing, extending the payment period up to a maximum of 60 installments.

The decision was made during a meeting of the NEA Board of Directors held on Monday evening, chaired by Minister of Energy, Water Resources, and Irrigation Shakti Bahadur Basnet. The board increased the installment arrangement to pay outstanding amounts.

Kulman Ghising, managing director of the NEA, stated that the board has implemented a special arrangement to facilitate installment payments for the same number of months or a maximum of 60 months for which the discount bill is issued.

Previously, during load shedding, customers in industrial, commercial, and non-commercial categories receiving electricity from dedicated feeders and trunk lines (lines connecting substations) were repeatedly urged through public notices to pay electricity tariffs with premiums. After they ignored these requests and refused to pay, the NEA began disconnecting power lines from December 22, 2023, in accordance with the Electricity Distribution Regulations, 2078 BS Regulation 31, and Electricity Tariff Collection Regulations, 2078 BS.

While common consumers experienced daily load shedding of up to 17/18 hours, 239 industrial, commercial, and non-commercial customers received more than 20 hours of electricity through dedicated feeders and trunk lines. Among these customers, 178 have paid electricity tariffs to the NEA on time, including premiums for dedicated and trunk lines.

The total outstanding amount for the 61 consumers using electricity from dedicated and trunk lines until mid-December 2023 is Rs 22.24 billion. Of this, the electricity lines of 23 industries with outstanding debts of more than Rs 50 million have been disconnected. The NEA plans to gradually disconnect the lines of other industries refusing to pay the arrears.

Himal Iron paid the first installment

Himal Iron and Steel, operating in Parwanipur under the Bara-Parsa Industrial Corridor, has commenced the repayment of outstanding bills through discounted billing for electricity consumption from dedicated and trunk lines.

Manoj Silwal, deputy managing director of NEA's Distribution and Customer Service Directorate, reported that Himal Iron made the first installment payment of Rs. 2.711 million out of the total Rs. 81.2 million.

Silwal further mentioned that following the industry's initial installment payment, the electricity line was reconnected at 9 PM on Monday. The NEA had previously disconnected the industrial line on Friday. The industry has committed to settling the remaining amount in 36 installments.

[2 January, 2024 / nagariknetwork.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries