energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  NEA can Collect Additional Fees from Industries only for Load Shedding Period: Commission

The Nepal Electricity Authority will not be able to collect additional fees from the industries for the electricity consumed before and after the load shedding period. This decision was taken by a meeting of the Electricity Regulatory Commission on Monday. The authority had announced that load shedding had ended on May 14, 2018.

The NEA has demanded the industries to pay additional tariffs even for the electricity consumed after the end of load shedding. The commission’s Secretary Gokarnaraj Pantha said that the commission meeting decided that the NEA will be allowed to collect additional fees only if there was load shedding in the country after May 2018.

According to Pantha, the commission canceled the additional fee for dedicated feeder and trunk line on June 15, 2020.

As the additional charge was valid until the cut-off date, industries will be liable to pay the dues as of June 15, 2020 on condition that that they had utilized electricity for more than twenty hours a day during load-shedding.

The commission’s secretary made it clear that all the customers are getting regular supply of electricity and the authority will not be allowed to charge additional fee for dedicated feeder and trunk lines during normal circumstances.

“The NEA can levy additional charges for using dedicated feeder and trunk lines only in case of load shedding. If the NEA can provide evidence that load shedding was taking place at that time, then it can levy the fee. The main dispute at present is about the bill issued by NEA after it announced the end of load shedding.”

[2 January, 2024 / newbusinessage.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries