energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  NEA Board of Directors decides to reconnect power supply

The Nepal Electricity Authority (NEA) is to resume power supply to consumers who have used electricity from dedicated feeders and trunk lines in the past but have not paid a premium charge for that.

The 960th meeting of the NEA Board of Directors held under the chairmanship of the Minister for Energy, Water Resources and Irrigation today decided to reconnect the electricity of the industries as per the decision of the cabinet meeting.

The NEA had disconnected the power supply to 24 industries that had to pay more than Rs 50 million tariff. The NEA Board of Directors had directed the NEA management to resume the power supply to such industries until the report is submitted by a probe commission formed by the government and a decision taken by the government.

The Cabinet meeting held on Tuesday had formed the probe commission under the coordination of former justice of the Supreme Court, Girish Chandra Lal, to recommend for the resolution of the power tariff dispute that surfaced between the NEA and industrialists. The Secretary of the Ministry of Energy, Water Resources and Irrigation, and the Industry Secretary were the members of the commission.

The meeting through the Energy Ministry had directed the NEA to reconnect the power supply until the next decision of the government. The Ministry had on Thursday sent a letter to implement the directive.

During a meeting of the National Concern and Coordination Committee of the National Assembly held on Thursday, NEA Deputy Executive Director Manoj Silwal had mentioned resuming power supply after making decision from the meeting of the NEA Board of Directors as per the government's directive.

[12 January, 2024 / risingnepaldaily.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries