energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Inquiry committee commences work to resolve trunk line and dedicated tariff dispute after 15-day delay

The inquiry committee formed to resolve the dedicated feeder and trunk line tariff dispute has started its work 15 days late. The Council of Ministers had formed an inquiry committee under the leadership of former Supreme Court Justice Girish Chandra Lal on January 9.

The meeting of the Council of Ministers decided to form the committee under the leadership of ex-justice Lal with joint secretaries of the Ministry of Energy, Water Resources and Irrigation (MoEWRI) and the Ministry of Industry, Commerce and Supply (MoICS) as members.

The members of the committee were changed later. MoEWRI Secretary Sushil Chandra Tiwari and MoICS Secretary Narayan Prasad Duwadi Sharma were later appointed as members of the committee.

An employee of the MoEWRI said that the dedicated feeder and trunk line tariff dispute resolution committee was not able to operate effectively due to the change of members of the committee.

“The investigation was delayed because the members of the investigation committee were changed several times,” he said.

Lal, the coordinator of the investigation committee, took the oath only on January 25. Chief Justice of the Supreme Court Bishowambhar Prasad Shrestha administered the oath to the coordinator, former-Justice Lal. Nabin Raj Singh, joint secretary of the MoEWRI and a member of the secretariat of the inquiry committee, said that the inquiry committee formed to resolve the dispute of the dedicated feeder and trunk line tariff has now started its work.

Joint Secretary Singh said that the meeting of the Council of Ministers decided to form the committee on January 9, but the committee coordinator Lal said that the work was started only after taking oath on January 25.

Prime Minister Pushpa Kamal Dahal had instructed the MoEWRI and the Nepal Electricity Authority (NEA) to cut the power lines of 61 industries that did not pay the electricity dues despite using trunk lines and dedicated feeders.

On the day after the Prime Minister's directive, i.e. on December 22, the NEA cut the power lines of four industries with the highest arrears. The NEA cut the line of 24 industrialists one after the other. Among them, Himal Iron and Steel, operating in Parwanipur under the Bara-Parsa Industrial Corridor, has started the repayment of outstanding bills through discounted billing for electricity consumption from dedicated and trunk lines. According to the NEA, it is yet to collect dues worth Rs 22.24 billion from 61 industrialists.

The Council of Ministers formed an inquiry committee headed by former justice Lal and decided to direct the NEA through the MoEWRI to reconnect the power lines until a decision is made by the Government of Nepal on the recommendation of the committee.

“The meeting of the Council of Ministers has given a mandate of only one month to the inquiry committee, it is uncertain whether the work can be done within a month,” said Singh, “But the committee is trying to do it within a month.”

[6 February, 2024 / nagariknetwork.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries