energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  DAO halts illegal mining in Chure area

The District Administration Office, Mahottari (DAO) has stopped illegal exploitation of the Khutti River within Chure Protected Area in Lahan Municipality-15.

Chief District Officer (CDO) Basudev Dahal stopped the illegal exploitation of Khutti River after being transferred to the district. The decision to halt the illegal excavation has caused panic among officials of Lahan Municipality, District Coordination Committee (DCC), and Division Forest Office.

The China Railway No-2 Engineering Group was illegally exploiting the protected forest areas of Chure in collaboration with the DCC and the Division Forest Office under the protection of the municipality.

According to sources, the CDO uncovered evidence of illegal mining operations and has taken a stand against the exploitation, aiming to dismantle the network facilitating such activities.

To the north of the Khutti River is the Chure Range and to the east is the Jhwai Kholsi Churia Danda Community Forest. The China Railway No-2 Engineering Group has been digging the river with an excavator, bypassing Chure and community forests.

This company, which is involved in the construction of a four-lane highway from Kamala in Siraha to Kanchanpur in Saptari under the East-West Highway.

Although the agreement with the company does not permit excavation with excavators, it has been found that such equipment was being used without Environmental Impact Assessment in the protected and forested areas along the river.

Officials and locals of Jhwai Kholsi Churia Danda Community Forest have been opposing illegal mining activities since the beginning. However, the locals say that attempts to speak out against these activities have been reciprocated with threats from the police.

Lagan Lal Chaudhary, chairman of Jhwai Kholsi Churia Danda Community Forest, says, “Excavation has ceased following media coverage, but the duration of this cessation remains uncertain.”

When the local level awards contracts for river excavation, the municipality verifies the quantity excavated every 15 days and sends it to the DCC by placing a signboard with the name of the contracting firm and businessmen, the contract number, and the quantity so that everyone can see it.

“But there is no signboard anywhere,” says Chaudhary.

The local level does not follow the rules because they exploit the rivers themselves. Under the guise of the municipality, the China Railway Company has been engaged in uncontrolled mining in the Chure Protected Area. They suppress the voices of the locals either by luring them or by threatening them.

No river material can be extracted from any river without conducting an Environmental Impact Assessment. Excavating in the rivers of Chure and protected areas necessitates an environmental impact assessment through the provincial forest ministry with the consent of the division forest office. However, when exploiting the resources through illegal setting, there is no requirement to adhere to standards, reports, or legal provisions.

Chaudhury, the chairman of the community forest, warns that unlimited exploitation in the name of development will result in destruction.

[13 February, 2024 / nagariknetwork.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries