energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  40 MW hydropower project proposed for construction in Sindhupalchowk’s Jugal

A 40-megawatt hydropower project is set to be constructed in Jugal Rural Municipality of Sindhupalchok district. Balephi Hydropower Pvt Ltd has submitted a proposal for a run-of-the-river project to harness the Balephi River's water for electricity generation.

The feasibility study of the project, which got the approval of the Ministry of Forests and Environment for an environmental impact assessment on March 25, 2017, has already been carried out. After some delay, the company has initiated the process to obtain the construction permit for the project.

The Department of Electricity Development (DOED) has issued a public notice on Thursday regarding this matter. The stakeholders are invited to provide written opinions or suggestions if there is a possibility of adverse effects during the project's construction.

With an installed capacity of 40 MW, the project is expected to generate 223.997 gigawatt hours of electricity annually. The intake and other structures will be located on the right bank of the Balefi River. A 40-meter-long and 5-meter-high dam will be constructed to manage water flow, with the power plant situated underground.

The project will feature three 3-phase generators, and the water released from the powerhouse will return to the Balefi river via a tailrace tunnel.

The electricity generated will be transmitted to the national grid through a 30 km long, 132 KV single-circuit transmission line passing through 12 substations currently under construction. According to the company, the project is expected to be completed within three years of commencing construction.

[28 March, 2024 / nagariknetwork.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries