energyNP.com  
Tel
98510-91900¡¡
Email
energyNP@hotmail.com¡¡
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy
 
  DOED initiates process to construct 132 kv transmission line for Mewakhola Hydropower

The Department of Electricity Development (DOED) is all set to construct a transmission line for the Mewakhola hydropower project currently under construction in Meringden Rural Municipality-3 of Taplejung. The department plans to carry electricity from Mewakhola to Dhungesanghu through the for the transmission line.

On Saturday, the DOED issued a public notice regarding the 132 KV power transmission line project, inviting stakeholders to provide feedback if there are any potential adverse impacts.

The transmission line will originate from the switchyard of the hydroelectric project being developed in Merringden-3. Spanning a length of 7.08 km, the line will connect to the Dhungesanghu substation of the Nepal Electricity Authority (NEA) in Maiwakhola Rural Municipality-1 through Atharai Triveni Rural Municipality-5.

The DOED's notice mentions that United Mewakhola Hydropower Limited, a subsidiary company of the developers of the hydropower project, has applied for permission to construct the transmission line in accordance with the provisions of Section 4 of the Electricity Act, 1992.

Stakeholders have been urged to submit written responses to the DOED or the broadcasting company within 35 days if they believe that the construction and operation of the proposed transmission line will have a significant adverse effect.

The single circuit transmission line will operate at a voltage of 132,000 volts and have the capacity to transmit power up to 50 megawatts. The project will involve the construction of 25 towers, with tower distances ranging from 91.83 meters to 673.88 meters and a maximum height of 33 meters.

Approximately 14.49 hectares of land will be needed for the transmission line project, with around 0.37 hectares of land required permanently for the 25 towers. Additionally, 12.74 hectares of land will fall under the jurisdiction of the power line.

Maintaining an 18-meter jurisdiction for the transmission line (9/9 meters on either side from the midpoint) is crucial from a technical standpoint, without compromising the minimum distance as prescribed in the Electricity Regulations, 1993. The target is to complete the transmission line within 12 months.

[6 April, 2024 / nagariknetwork.com ]¡¡¡¡¡¡
 
¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Electric Folded Treadmill Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries