energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  48 km of Beni-Jomsom-Korala Road Section Blacktopped

A 48-kilometer stretch of the Beni-Jomsom-Korala route within the Kaligandaki Corridor has been recently blacktopped. This corridor serves as a vital link between the southern border of India and the northern border of China.

The Kaligandaki Corridor, spanning 435 kilometers from Triveni at the Indian border to the Korala transit point in China, stands as a flagship project of national significance.

Initiated in 2074 BS, the construction of this road project, comprising fourteen segments, has seen the completion of eight sections so far. Dhurba Kumar Jha, the project's head, reports that as of the end of 2080 BS, the physical progress has reached 78 percent.

Within six segments, a total of 85 kilometers of gravel roads and 48 kilometers of blacktopped roads have been completed. Additionally, the construction includes the erection of 13 concrete bridges and three Bailey bridges, with motorable bridges currently being built at six locations.

Jha notes that utilizing DBSD technology, sections such as Kaiku-Khanti in Mustang (16 km), Khanti-Tukuche-Marfa (9 km), Ghasa-Kaikukhola (2 km) in Mustang, Tiplyang-Tatopani (6 km) in Myagdi, Beni-Galeshwar (4 km), and Galeshwar-Begkhola (3 km) have been surfaced with blacktop.

Information officer Bishnu Chapagain affirms that construction companies have been directed to blacktop an additional 13 km stretch from Jomsom to Kagbeni, the Tatopani-Ghasa section, and 6 km of the Marfa-Jomsom section within the current fiscal year.

The estimated cost for the project stands at Rs 10 billion, with approximately Rs 7 billion already spent.

[14 April, 2024 / newbusinessage.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries