energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  NEA discontent over inquiry committee’s report on clearance of dues of dedicated feeders and trunk lines

While the government has turned lenient on the side of the industrialists regarding the issue of the dues of dedicated feeder and trunk lines, the Nepal Electricity Authority (NEA) is unsatisfied with the government’s decision.

Last week, a cabinet meeting decided to implement the report of the inquiry committee formed to investigate the controversial tariff dispute. The government on January 9 formed the committee under the leadership of former Supreme Court Justice Girish Chandra Lal with joint secretaries of the Ministry of Energy, Water Resources and Irrigation (MoEWRI) and the Ministry of Industry, Commerce and Supplies (MoICS) as members.

On May 5, the committee submitted its report to the government. The committee has recommended the government not to take premium charges of the dedicated feeders and trunk lines from the industrialists for the first six months during mid-July, 2015 and mid-January, 2016. Likewise, the inquiry report also talks about waiving the premium charges of the period beyond June 2018, when the government declared the end of the loadshedding in the country. Manufacturers have long been expressing their dissatisfaction citing the NEA’s attempt to take premium charges of these time periods too.

Citing power outage issues, the NEA, in 2015, enforced the rule to impose additional fees on industries that consume lots of energy. Earlier, the NEA had been charging 65 percent as premium charge for the users of dedicated and trunk lines, which later on reduced to 15 percent on top of the normal tariff.

Under the dedicated feeder service, a factory that needs high voltage lines is permitted to receive direct electricity from a nearby substation, while those using trunk lines can receive regular electricity through two substations. In June 2015, a board meeting of the NEA had set the premium charges for factories using electricity through dedicated feeders from August that year.

Manufacturers, however, have been denying paying the dues on the dedicated feeders and trunk lines. They have blamed the NEA for slapping the premium charge of period even after the load shedding was declared officially over.

The committee has suggested the state-owned power utility take premium charges of electricity used during the period of February 2016 and April 2018. However, it has recommended charging a special fee based on the consumption amount recorded by the Times of the Day (TOD) meter.

Kulman Ghising, managing director of the NEA, however expressed his discontent over the committee’s report. “The report will not help give a long-term solution to resolve the issue,” Ghising said.

According to the NEA officials, there is no proper mechanism to issue billing of electricity use on a daily basis. “There could be a practical problem like if the NEA had provided premium electricity supply for the whole day, while the firms had shut their businesses for a few hours,” said Ghising, adding that they have been waiting for the clear guidance from the government to put the official comment over the issue.

[22 May, 2024 / nagariknetwork.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries