energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Pressure shaft installed at Rahughat hydropower project tunnel

The 'Pressure Shaft' of the 40 MW Rahughat hydropower project under construction in Raghuganga Rural Municipality of Myagdi has been connected.

According to the project, a 1,049-metre-long pressure shaft tunnel of the hydropower project has been connected.

Project Manager Raj Bahadur Bista said that the outlet (end point) of the main tunnel located in Raghuganga Rural Municipality-3, Piple has been connected to the under-construction power plant in Tilkenichaur.

The project has taken the connection of this tunnel as its main achievement.

Earlier, the adit 2 and 3 tunnels, 329-metres-bottom and 196-metres-long vertical pressure shaft tunnels have been connected.

Bista said that a pressure shaft has been built to keep the pipeline that will take the water coming from the main tunnel to the power plant.

According to the project, after the tunnel is connected, the work of connecting the pipeline to the pressure shaft will proceed.

The construction of a 61-metre-deep search shaft has been completed in Piple.

Project manager Bista said that only 125 metres of the 6,270-metre-long tunnel connecting adit 1 and 2 has yet to be dug.

The 3,836-metre-long tunnel connecting the second and third adits was connected on February 22, 2023.

The overall physical progress on the civil side of the project is 57 per cent.

A contract agreement was signed with Jaiprakash Associates (JP), the civil contractor of the project under the joint investment of the Indian Exim Bank with a concessional loan of USD 67 million and the Authority and the government of Nepal on November 2017.

[24 May, 2024 / risingnepaldaily.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries