energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Motorable bridges along Diktel-Chakhewa Bhanjyang road section constructed before deadline

Two motorable bridges along the Diktel-Chakhewa Bhanjyang road section have been constructed before their deadlines.

The bridges were constructed over the Bhalukhola stream of Solma, Majhuwagadhi Municipality-2, and over the Mewakhola stream of Nerpa, Majhuwagadhi-6. The road section belongs to the Mid-Hill Highway.

The construction company was hired by the Department of Roads two years ago so as to complete the undertaking before July 6, 2024. The construction cost of the bridges was Rs 77.4 million.

Both newly constructed bridges are 20-meter long.

The construction of even the approach roads has been completed.

General Secretary of Khotang Transport Pvt Ltd, Ram Hingmang, informed RSS that road transportation has been eased after the construction of these two motorable bridges.

In the same road section, another 20-meter long bridge has also been completed before the deadline. The motorable bridge is built over the Chhepekhola stream located on the border of Nerpa and Solma villages. Sagarmatha JV was contracted for building these physical infrastructures.

Representative of the construction company, Krishna Ghimire, informed RSS that the undertaking was over and the bridges had come into operation.

Chief of the District Coordination Committee, San Bahadur Rai, said they had directed the construction companies frequently to maintain quality and complete the bridges on time. "We encouraged the construction company to complete the undertaking on time. It was not possible to conclude the construction before the rains, but they did," he said, adding that they were planning to award the contractor.

Meanwhile, the Siruwa Construction Kathmandu failed to complete the bridge over the Pankhukhola stream that links Buwasung to Lamidanda, resulting in the cancellation of the contract. The contract was terminated on May 25.

The locals are worried over the indifference of the concerned sectors to intensify the works of bridge construction, which would ease road transportation to Bhojpur from the district.

[18 June, 2024 / nagariknetwork.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries